Load Bank Testing

Testing the integrity of all electrical interconnections

Power Control offers a complete load bank testing service in order to test the integrity of all the electrical interconnections. Get in touch to find out more on how you can take advantage of our quality load bank testing service.

Load bank testing

Load bank testing provides information on a battery’s autonomy at the time of the test, as well as the integrity of all the electrical interconnections. The test is carried out when the uninterruptible power supply (UPS) is under load conditions to ensure the batteries are working optimally or to show whether any of the batteries are approaching the end of their working life or about to fail. The test is carried out with a device, the load bank, which develops an electrical load, applies the load to the UPS system or generator and converts or dissipates the resultant power output of the source.

When testing a system, the load bank should be placed no more than 20 meters from PDU or UPS terminals. However, it is important to remember allowances for heat dissipation need to be addressed to allow the load bank fans to cool the system. A resistive load stimulates real-life resistive loads, such as incandescent lighting and heating loads as well as the resistive or unity power factor component of magnetic loads.

Upon completion of a load bank test, system performance is determined using measurements taken during discharge. The test is useful for identifying problems with generators or UPS systems prompting immediate actions to be taken to facilitate its efficiency.